thread I think revit for detailing is hell
the only good thing will be that it'll prove that nobody looks at the drawings.

permalink This.
It's taken me 4.5hrs to do 9 details. That's about a third of my usual output using MSTN or AutoCAD. We're not going to hit our C01 cast-in connection plate issue today, and possibly not even on Monday, despite having 4 of us CAD monkeys working flat out.

"Yeah, but BIM" say the engineers, conveniently forgetting that BIM is all very well, but it still comes down to guys with drawings on site.